Thank you for your patience while we retrieve your images.


Thumbnails
Info
Photo Info

Dimensions4256 x 2652
Original file size5.73 MB
Image typeJPEG
Color spacesRGB
Date taken10-Sep-12 04:13
Date modified21-Dec-12 11:47
Shooting Conditions

Camera makeNIKON CORPORATION
Camera modelNIKON D3
Focal length24 mm
Focal length (35mm)24 mm
Max lens aperturef/2.8
Exposure1/500 at f/11
FlashNot fired
Exposure bias0 EV
Exposure modeAuto
Exposure prog.Normal
Metering modePattern
Digital zoom1x
2

2

PowerPac Mutiara Keraniganj Power Plant Ltd. is a Concern of Sikder Group and a renowned Rental Power Plant of Bangladesh. The 100 MW power plant is situated near Dhaka, at Char Galgalia, Abdullahpur, Keraniganj. The primary fuel used to run the engines is HFO (Heavy Fuel Oil). The HFO is arranged from own source through their nominated fuel supplier and, transported by inland water vessels. The produced power is delivered at Hasanbad 132 KV national grid. BPDB (Bangladesh Power Development Board) purchases the power from them, under an extended Rental Contract. The plant is running with superior plant factor and maximum plant availability since it began commercial operation on March 27, 2012. The plant is commissioned with Caterpillar engines, made in Germany.